A 4.6-acre landfill must be evaluated for

Chapter , Problem 16-49

(choose chapter or problem)

A 4.6-acre landfill must be evaluated for economicviability. As part of the costbenefit analysis, thecost to extract and treat the landfill gas must bedetermined.Using the following, design a landfill gasextraction system and estimate the cost to implementsuch a system:Landfill dimensions are 1000 feet by 200 feet.Area of influence of a landfill gas extractionwell is a 50-foot radius.Cost of well construction is $3000 each.Cost of wellhead (necessary for each well) is$2500 each.Cost of collection header piping 8diameterHDPE is $35/linear foot.Cost of condensate knockouts (located at lowpoints) is $5000 each.Cost of blower/flare station is $500,000.

Unfortunately, we don't have that question answered yet. But you can get it answered in just 5 hours by Logging in or Becoming a subscriber.

Becoming a subscriber
Or look for another answer

×

Login

Login or Sign up for access to all of our study tools and educational content!

Forgot password?
Register Now

×

Register

Sign up for access to all content on our site!

Or login if you already have an account

×

Reset password

If you have an active account we’ll send you an e-mail for password recovery

Or login if you have your password back