In a geothermal district heating system, 10,000 kg/s of

Chapter 8, Problem 138P

(choose chapter or problem)

Problem 138P

In a geothermal district heating system, 10,000 kg/s of hot water must be delivered a distance of 10 km in a horizontal-pipe. The minor losses are negligi­ble, and the only significant energy loss arises from pipe fric­tion. The friction factor is taken to be 0.015. Specifying a larger-diameter pipe would reduce water velocity, velocity head, pipe friction, and thus power consumption. But a larger pipe would also cost more money initially to purchase and install. Otherwise stated, there is an optimum pipe diameter that will minimize the sum of pipe cost and future electric power cost.

 Assume the system will run 24 h/day, every day, for 30 years. During this time the cost of electricity remains con­stant at $0.06/kWh. Assume system performance stays con­stant over the decades (this may not be true, especially if highly mineralized water is passed through the pipeline- scale may form). The pump has an overall efficiency of 80 percent. The cost to purchase, install, and insulate a 10-km pipe depends on the diameter D and is given by Cost = $106D2, where D is in m. Assuming zero inflation and interest rate for simplicity and zero salvage value and zero maintenance cost, determine the optimum pipe diameter.

Unfortunately, we don't have that question answered yet. But you can get it answered in just 5 hours by Logging in or Becoming a subscriber.

Becoming a subscriber
Or look for another answer

×

Login

Login or Sign up for access to all of our study tools and educational content!

Forgot password?
Register Now

×

Register

Sign up for access to all content on our site!

Or login if you already have an account

×

Reset password

If you have an active account we’ll send you an e-mail for password recovery

Or login if you have your password back