Solved: A temporary construction elevator is to be
Chapter 17, Problem 17-30(choose chapter or problem)
A temporary construction elevator is to be designed to carry workers and materials to a height of 90 ft. The maximum estimated load to be hoisted is 5000 lbf at a velocity not to exceed 2 ft/s. For minimum sheave diameters and acceleration of \(4 \mathrm{ft} / \mathrm{s}^2\) , specify the number of ropes required if the 1 2-in plow-steel \(6 \times 19\) hoisting strand is used.
Unfortunately, we don't have that question answered yet. But you can get it answered in just 5 hours by Logging in or Becoming a subscriber.
Becoming a subscriber
Or look for another answer