×
Log in to StudySoup
Get Full Access to Engineering Economy (1) - 16 Edition - Chapter 18 - Problem 18.19
Join StudySoup for FREE
Get Full Access to Engineering Economy (1) - 16 Edition - Chapter 18 - Problem 18.19

Already have an account? Login here
×
Reset your password

An engineer must decide between two ways topump concrete

Engineering Economy (1) | 16th Edition | ISBN: 9780133439274 | Authors: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling ISBN: 9780133439274 207

Solution for problem 18.19 Chapter 18

Engineering Economy (1) | 16th Edition

  • Textbook Solutions
  • 2901 Step-by-step solutions solved by professors and subject experts
  • Get 24/7 help from StudySoup virtual teaching assistants
Engineering Economy (1) | 16th Edition | ISBN: 9780133439274 | Authors: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling

Engineering Economy (1) | 16th Edition

4 5 1 324 Reviews
22
1
Problem 18.19

An engineer must decide between two ways topump concrete to the top of a seven-story building.Plan 1 requires the leasing of equipment for$60,000 initially and will cost between $0.40 and$0.95 per metric ton to operate, with a most likelycost of $0.50 per metric ton. The pumper is ableto deliver 100 metric tons per 8-hour day. Ifleased, the asset will have a contract period of5 years. Plan 2 is rental option that will cost$15,000 per year. In addition, an extra $15 perhour labor cost will be incurred for operating therented equipment per 8-hour day. Which planshould the engineer recommend if the equipmentwill be needed for 50 days per year? The MARRis 12% per year.

Step-by-Step Solution:
Step 1 of 3

Lecture 14: Thermodynamics Part 2 Objectives  Key concepts o Energy, heat, and work all have the same dimension o Energy is a conserved quantity 1st law of thermodynamics o Energy has quality as well as quantity 2nd law of thermodynamics o Objects like rocks or working fluids have several forms of energy  Internal energy, gravitational potential energy, kinetic energy o Calculate 5 types mechanical energy (work) o Formulate solution strategy by applying 1st law o Identify simple systems that violate the 1st law o Explain the effect of assumptions on the 1st law First law of thermodynamics  Energy can be converted from one form to another, but total ene

Step 2 of 3

Chapter 18, Problem 18.19 is Solved
Step 3 of 3

Textbook: Engineering Economy (1)
Edition: 16
Author: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
ISBN: 9780133439274

The answer to “An engineer must decide between two ways topump concrete to the top of a seven-story building.Plan 1 requires the leasing of equipment for$60,000 initially and will cost between $0.40 and$0.95 per metric ton to operate, with a most likelycost of $0.50 per metric ton. The pumper is ableto deliver 100 metric tons per 8-hour day. Ifleased, the asset will have a contract period of5 years. Plan 2 is rental option that will cost$15,000 per year. In addition, an extra $15 perhour labor cost will be incurred for operating therented equipment per 8-hour day. Which planshould the engineer recommend if the equipmentwill be needed for 50 days per year? The MARRis 12% per year.” is broken down into a number of easy to follow steps, and 113 words. Since the solution to 18.19 from 18 chapter was answered, more than 247 students have viewed the full step-by-step answer. This textbook survival guide was created for the textbook: Engineering Economy (1), edition: 16. The full step-by-step solution to problem: 18.19 from chapter: 18 was answered by , our top Engineering and Tech solution expert on 01/03/18, 09:30PM. This full solution covers the following key subjects: . This expansive textbook survival guide covers 19 chapters, and 1299 solutions. Engineering Economy (1) was written by and is associated to the ISBN: 9780133439274.

Other solutions

People also purchased

Related chapters

Unlock Textbook Solution

Enter your email below to unlock your verified solution to:

An engineer must decide between two ways topump concrete