Evaluating the performance of quality inspectors. The

Chapter 3, Problem 120SE

(choose chapter or problem)

Get Unlimited Answers
QUESTION:

Problem 120SE

Evaluating the performance of quality inspectors. The performance of quality inspectors affects both the quality of outgoing products and the cost of the products. A product that passes inspection is assumed to meet quality standards; a product that fails inspection may be reworked, scrapped, or reinspected. Quality engineers at an electric company evaluated performances of inspectors in judging the quality of solder joints by comparing each inspector’s classifications of a set of 153 joints with the consensus evaluation of a panel of experts. The results for a particular inspector are shown in the table. One of the 153 solder joints was selected at random.

a. What is the probability that the inspector judged the joint to be acceptable? That the committee judged the joint to be acceptable?

b. What is the probability that both the inspector and the committee judged the joint to be acceptable? That neither judged the joint to be acceptable?

c. What is the probability that the inspector and the committee disagreed? Agreed?

Questions & Answers

QUESTION:

Problem 120SE

Evaluating the performance of quality inspectors. The performance of quality inspectors affects both the quality of outgoing products and the cost of the products. A product that passes inspection is assumed to meet quality standards; a product that fails inspection may be reworked, scrapped, or reinspected. Quality engineers at an electric company evaluated performances of inspectors in judging the quality of solder joints by comparing each inspector’s classifications of a set of 153 joints with the consensus evaluation of a panel of experts. The results for a particular inspector are shown in the table. One of the 153 solder joints was selected at random.

a. What is the probability that the inspector judged the joint to be acceptable? That the committee judged the joint to be acceptable?

b. What is the probability that both the inspector and the committee judged the joint to be acceptable? That neither judged the joint to be acceptable?

c. What is the probability that the inspector and the committee disagreed? Agreed?

ANSWER:

Solution 120SE

Step1 of 4:

Let us consider a data set:

Inspector's Judgment

Committee's Judgment

Joint Acceptable

Joint Rejectable

Total

Joint Acceptable

101

10

111

Joint Rejectable

23

19

42

Total

124

29

Add to cart


Study Tools You Might Need

Not The Solution You Need? Search for Your Answer Here:

×

Login

Login or Sign up for access to all of our study tools and educational content!

Forgot password?
Register Now

×

Register

Sign up for access to all content on our site!

Or login if you already have an account

×

Reset password

If you have an active account we’ll send you an e-mail for password recovery

Or login if you have your password back