A geothermal supply of hot water operates a steam turbine,

Chapter 4, Problem 203EUP

(choose chapter or problem)

Get Unlimited Answers
QUESTION:

Problem 203EUP

A geothermal supply of hot water operates a steam turbine, as shown in Fig. P4.125 The highpressure water at 200 lbf/in.2, 350 F is throttled into a flash evaporator chamber, which forms liquid and vapor at a lower pressure of 60 lbf/in.2. The liquid is discarded while the saturated vapor feeds the turbine and exits at 1 lbf/in.2, 90% quality. If the turbine should produce 1000 hp, find the required mass flow rate of hot geothermal water.

FIGURE P4.125

Questions & Answers

QUESTION:

Problem 203EUP

A geothermal supply of hot water operates a steam turbine, as shown in Fig. P4.125 The highpressure water at 200 lbf/in.2, 350 F is throttled into a flash evaporator chamber, which forms liquid and vapor at a lower pressure of 60 lbf/in.2. The liquid is discarded while the saturated vapor feeds the turbine and exits at 1 lbf/in.2, 90% quality. If the turbine should produce 1000 hp, find the required mass flow rate of hot geothermal water.

FIGURE P4.125

ANSWER:

Solution

Step 1 of 3

We need to find out the required mass flow rate of hot geothermal water.

Add to cart


Study Tools You Might Need

Not The Solution You Need? Search for Your Answer Here:

×

Login

Login or Sign up for access to all of our study tools and educational content!

Forgot password?
Register Now

×

Register

Sign up for access to all content on our site!

Or login if you already have an account

×

Reset password

If you have an active account we’ll send you an e-mail for password recovery

Or login if you have your password back