In water-resources engineering, the sizing of reservoirs depends on accurate estimates

Chapter 14, Problem 14.25

(choose chapter or problem)

In water-resources engineering, the sizing of reservoirs depends on accurate estimates of water flow in the river that is being impounded. For some rivers, long-term historical records of such flow data are difficult to obtain. In contrast, meteorological data on precipitation are often available for many years past. Therefore, it is often useful to determine a relationship between flow and precipitation. This relationship can then be used to estimate flows for years when only precipitation measurements were made. The following data are available for a river that is to be dammed: Precip., cm/yr 88.9 108.5 104.1 139.7 127 94 116.8 99.1 Flow, m3/s 14.6 16.7 15.3 23.2 19.5 16.1 18.1 16.6 (a) Plot the data. (b) Fit a straight line to the data with linear regression. Superimpose this line on your plot. (c) Use the best-fit line to predict the annual water flow if the precipitation is 120 cm. (d) If the drainage area is 1100 km2 , estimate what fraction of the precipitation is lost via processes such as evaporation, deep groundwater infiltration, and consumptive use.

Unfortunately, we don't have that question answered yet. But you can get it answered in just 5 hours by Logging in or Becoming a subscriber.

Becoming a subscriber
Or look for another answer

×

Login

Login or Sign up for access to all of our study tools and educational content!

Forgot password?
Register Now

×

Register

Sign up for access to all content on our site!

Or login if you already have an account

×

Reset password

If you have an active account we’ll send you an e-mail for password recovery

Or login if you have your password back