Resolve Example 12.8, except with the generation at bus 2
Chapter , Problem 12.25(choose chapter or problem)
Resolve Example 12.8, except with the generation at bus 2 set to a fixed value (i.e., modeled as o_ of AGC). Plot the variation in the total hourly cost as the generation at bus 2 is varied between 1000 and 200 MW in 5-MW steps, resolving the economic dispatch at each step. What is the relationship between bus 2 generation at the minimum point on this plot and the value from economic dispatch in Example 12.8? Assume a Load Scalar of 1.0.
Unfortunately, we don't have that question answered yet. But you can get it answered in just 5 hours by Logging in or Becoming a subscriber.
Becoming a subscriber
Or look for another answer