Electricity is sold for $0.12 per kilowatt-hour(kWh) for the first 10,000 units each month and$0.09/kWh for all remaining units. If a firm uses14,000kWh/month, what is its average and marginalcost?
Read moreTextbook Solutions for Engineering Economic Analysis
Question
Bob Johnsondecided to buy a new home. After look-ing at tracts of new homes, he decided that a custom-built home was preferable. He hired an architect toprepare the drawings. In due time, the architect com-pleted the drawings and submitted them. Bob likedthe plans; he was less pleased that he had to pay thearchitect a fee of $7000 to design the house. Bobasked a building contractor to provide a bid to con-struct the home on a lot Bob already owned. Whilethe contractor was working to assemble the bid, Bobcame across a book of standard house plans. In thebook was a home that he and his wife liked betterthan the one designed for them by the architect. Bobpaid $200 and obtained a complete set of plans forthis otherhouse.Bob then askedthe contractorto pro-vide a bid to construct this stock plan home. In thisway Bob felt he could compare the costs and makea decision. The building contractor submitted thefollowing bids:Custom-designed home $258,000Stock-plan home 261,000Bob was willing to pay the extra$3000 for it. Bobswife, however, felt they should go ahead with thecustom-designed home, for, as she put it, We cantafford to throw away a set of plans that cost $7000.Bob agreed, but he disliked the thought of building ahome that is less desirable than the stock plan home.Then he asked your advice. Which house would youadvise him to build? Explain
Solution
The first step in solving 2 problem number 22 trying to solve the problem we have to refer to the textbook question: Bob Johnsondecided to buy a new home. After look-ing at tracts of new homes, he decided that a custom-built home was preferable. He hired an architect toprepare the drawings. In due time, the architect com-pleted the drawings and submitted them. Bob likedthe plans; he was less pleased that he had to pay thearchitect a fee of $7000 to design the house. Bobasked a building contractor to provide a bid to con-struct the home on a lot Bob already owned. Whilethe contractor was working to assemble the bid, Bobcame across a book of standard house plans. In thebook was a home that he and his wife liked betterthan the one designed for them by the architect. Bobpaid $200 and obtained a complete set of plans forthis otherhouse.Bob then askedthe contractorto pro-vide a bid to construct this stock plan home. In thisway Bob felt he could compare the costs and makea decision. The building contractor submitted thefollowing bids:Custom-designed home $258,000Stock-plan home 261,000Bob was willing to pay the extra$3000 for it. Bobswife, however, felt they should go ahead with thecustom-designed home, for, as she put it, We cantafford to throw away a set of plans that cost $7000.Bob agreed, but he disliked the thought of building ahome that is less desirable than the stock plan home.Then he asked your advice. Which house would youadvise him to build? Explain
From the textbook chapter you will find a few key concepts needed to solve this.
Visible to paid subscribers only
Step 3 of 7)Visible to paid subscribers only
full solution