The article Limited Yield Estimation for Visual Defect
Chapter 7, Problem 7.19(choose chapter or problem)
The article Limited Yield Estimation for Visual Defect Sources (IEEE Trans. on Semiconductor Manuf., 1997: 1723) reported that, in a study of a particular wafer inspection process, 356 dies were examined by an inspection probe and 201 of these passed the probe. Assuming a stable process, calculate a 95% (two-sided) confidence interval for the proportion of all dies that pass the probe.
Unfortunately, we don't have that question answered yet. But you can get it answered in just 5 hours by Logging in or Becoming a subscriber.
Becoming a subscriber
Or look for another answer